JUSTIFICATION OF REQUIREMENTS TO THE VOLUME OF THE START-UP COMPLEX OF TECHNICAL MEANS OF RADIATION CONTROL DURING THE PHYSICAL START-UP OF NOVOVORONEZH NPP-2 POWER UNITS
Abstract and keywords
Abstract (English):
The physical start-up is a stage of the power unit commissioning, which includes reactor core fuelling, achieving the first criticality and completion of all required tests and measurements at the power level. At the stages of physical start-up the priority task is to determine the scope of radiation monitoring equipment, put into operation and sufficient for absolute safety assurance and unambiguous assessment of the power unit radiation exposure of personnel, population and environment.

Keywords:
activity, control, circuit, period, product, start-up, radionuclide, coolant, nuclear fuel element, stage, power unit
References

1. Obschie polozheniya obespecheniya bezopasnosti atomnyh stanciy NP-001-15.

2. Sanitarnye pravila proektirovaniya i ekspluatacii atomnyh stanciy (SP AS-03) SanPiN 2.6.1.24-03.

3. Novovoronezhskaya AES-2 s energoblokami 1 i 2. Otchet po obosnovaniyu bezopasnosti. Hranilische svezhego topliva. NW2O.W.120.0.0UFC&&.&&&&&.000.HD.0001.

4. Egorov Yu.A. Osnovy radiacionnoy bezopasnosti atomnyh elektrostanciy. M.: Energoizdat, 1982.

5. Malygin V.B. Ekspluatacionnye svoystva materialov dlya obosnovaniya proektov tvelov energeticheskih reaktorov. M.: MIFI, 2007.

Login or Create
* Forgot password?